The Project
Appointed by Pentland Homes on a £7.5 million groundworks contract. We completed the full groundworks first and second phase to build 170 2-4 bedroom houses.
Summary of works
- Working with Natural England and Clients Ecology Consultants in response to on site reptile management
- Laying car park etc. for main site accommodation
- Laying all groundworks in the formation of the main sales unit later reinstating
- 278 works, in road widening and junction reconfiguring along country lane adjacent to the developments entrance
- Excessive surface water management control attenuation, in forming a series of oversize drainage discharging into large swales at the perimeter the site
- Bulk excavation, cut and fill throughout the site
- Piling and precast groundbeams to all units
- Site is part of Romney Marsh and as such, groundwater strategy had to be put in place during the course of the works to minimise the effect to deep excavations
- Deep drainage
- Installing standard precast concrete block and beam floors
- All main services
- All estate roads and main access road, including KCC specification street lighting
- All external paving’s surrounding the units grading, importing and laying topsoil
- Grading, topsoiling and laying out the public open spaces, including paths