Woodlands Green

Location: Staplehurst
Developer: Redrow Homes
Value: £8.5 million

The Project

Appointed by Redrow Homes on an £8.5 million groundworks contract for the full groundworks to build 175, 2 – 5 bedroom houses as well as 1 block of 6 apartments.

Summary of works

  • Working with Natural England and Clients Ecology Consultants in response to on site reptile management
  • Initially operating as Principal Contractor
  • Laying car park etc. for main site accommodation including helicopter landing zone
  • Laying all groundworks in the formation of the main sales unit later reinstating
  • 278 works, in rerouting an adjacent country lane adjacent to the developments entrance
  • Building a deep wet well complete with 80m high pressure foul pipe outlet to adjacent mains sewer
  • Draining and remediation of existing ponds
  • Excess surface water management control attenuation, forming a series of ponds and swales through the site including ditches partly supported by gabion walls
  • Bulk excavation, cut and fill throughout the site
  • Piling and groundbeams to some units
  • Traditional trench excavation
  • Deep drainage
  • Installing high insulated jet floor system including laying structural screed
  • All main services, including an electric sub station
  • All estate roads and main access road, including high-end street lighting
  • All external pavings surrounding the units grading and laying top soil
  • Grading, topsoiling and laying out the public open spaces, including paths
  • Installation of retaining brick, and gabion walls