The Project
Appointed by Redrow Homes on an £8.5 million groundworks contract for the full groundworks to build 175, 2 – 5 bedroom houses as well as 1 block of 6 apartments.
Summary of works
- Working with Natural England and Clients Ecology Consultants in response to on site reptile management
- Initially operating as Principal Contractor
- Laying car park etc. for main site accommodation including helicopter landing zone
- Laying all groundworks in the formation of the main sales unit later reinstating
- 278 works, in rerouting an adjacent country lane adjacent to the developments entrance
- Building a deep wet well complete with 80m high pressure foul pipe outlet to adjacent mains sewer
- Draining and remediation of existing ponds
- Excess surface water management control attenuation, forming a series of ponds and swales through the site including ditches partly supported by gabion walls
- Bulk excavation, cut and fill throughout the site
- Piling and groundbeams to some units
- Traditional trench excavation
- Deep drainage
- Installing high insulated jet floor system including laying structural screed
- All main services, including an electric sub station
- All estate roads and main access road, including high-end street lighting
- All external pavings surrounding the units grading and laying top soil
- Grading, topsoiling and laying out the public open spaces, including paths
- Installation of retaining brick, and gabion walls